Measure A at a Glance
WHAT: A $298 million facility bond measure designed to maintain excellent neighborhood schools, offset state budget cuts, and retain/attract quality teachers without increasing the 2012 tax rate.
WHEN: California’s Presidential Primary Election June 5, 2012
TAX
IMPACT: As in recent CUSD bond measures, if approved, Measure A would not increase the existing tax rate at the time of the election.
Watch Video
Schools on
Project List: Every school in Clovis Unified would benefit from construction & renovation included on the Measure A project list.
EXAMPLES
of Projects:
• Upgrading classrooms, science labs, fire safety systems and libraries
• Acquiring sites, constructing and equipping new schools
• Improving energy efficiency systems to return money spent on utilities to the classroom
• Enhancing vocational education facilities
• Ensuring handicapped accessibility
• Health and safety improvements to older schools to repair deteriorating restrooms and leaky roofs, replace outdated heating and air conditioning systems, security systems and fire alarms
Project List
Kastner Intermediate School (32 years old)
- Replace roofing on campus
- Reconfigure space for choir room
- Repairs to door hardware and casework
- Renovate pool, decking and equipment
- Replace floor coverings
- Replace gym bleachers and lockers in locker rooms
- Upgrade HVAC system
- Lighting efficiency improvements
- Improved exterior lighting
- Upgrade technology data network and wireless technology which will increase bandwidth and Internet access
- Replace fire alarm
- Replace PA, clock, phone system
- New Exterior Video Surveillance System
- Replace restroom plumbing fixtures and upgrade interior of restrooms
- Various landscaping upgrades to interior campus including amphitheater area
- Repair and upgrade irrigation system, improve turf condition, drainage on play fields
- Complete Americans with Disabilities Act (ADA) required upgrades
Go Back