Measure A at a Glance
WHAT: A $298 million facility bond measure designed to maintain excellent neighborhood schools, offset state budget cuts, and retain/attract quality teachers without increasing the 2012 tax rate.
WHEN: California’s Presidential Primary Election June 5, 2012
TAX
IMPACT: As in recent CUSD bond measures, if approved, Measure A would not increase the existing tax rate at the time of the election.
Watch Video
Schools on
Project List: Every school in Clovis Unified would benefit from construction & renovation included on the Measure A project list.
EXAMPLES
of Projects:
• Upgrading classrooms, science labs, fire safety systems and libraries
• Acquiring sites, constructing and equipping new schools
• Improving energy efficiency systems to return money spent on utilities to the classroom
• Enhancing vocational education facilities
• Ensuring handicapped accessibility
• Health and safety improvements to older schools to repair deteriorating restrooms and leaky roofs, replace outdated heating and air conditioning systems, security systems and fire alarms
Project List
Oraze Elementary School (1 year old)
- New Exterior Video Surveillance System
- Reyburn Intermediate School (13 years old)
- Upgrade HVAC systems
- Upgrade technology data network and wireless technology to increase bandwidth and Internet access
- Replace fire alarm
- Repairs to door hardware, casework, wall finishes, floor coverings where needed
- Efficiency improvements in lighting for classrooms, MPR, main office, library
- New Exterior Video Surveillance System
- Replace restroom plumbing fixtures and upgrade interior of restrooms
- Repair and upgrade irrigation system, improve turf condition, drainage on play fields
- Complete Americans with Disabilities Act (ADA) required upgrades
- Clovis East High School (13 years old)
- Upgrade counseling/career center
- Upgrade HVAC systems
- Replace fire alarm
- New Exterior Video Surveillance System
- Upgrade existing or additional Career Tech facilities
- Renovate pool, decking and equipment
- Repairs to door hardware, casework and wall finishes
- Replace floor coverings
- Efficiency improvements in lighting for classrooms, MPR, main office, library
- Improved exterior lighting
- Upgrade technology data network and wireless technology to increase bandwidth and Internet access
- Replace restroom plumbing fixtures and upgrade interior of restrooms
- Various landscaping upgrades to interior campus
- Repair and upgrade irrigation system, improve turf condition, drainage on play fields
- Upgrade surfaces on play courts
- Complete Americans with Disabilities Act (ADA) required upgrades
Go Back